Concrete Ditch Replacement and Wing wall backfill

Inactive
Notice ID:W9123720Q0082

3.1 Concrete Ditch Removal: The Contractor shall remove the existing concrete gutter and excavate materials from the ditch area. The gutter replacement is approximately 100’ in length, 2 feet in width...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY US ARMY ENGINEER DISTRICT HUNTINGTO
  PSC   MISCELLANEOUS CONSTRUCTION MATERIALS
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »