Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W91237-21-Q-0017
Contractor shall provide all labor, materials, & equipment necessary to to Dry-Dock and Repair the Storage Barge 792 in accordance with the attached Solicitation, the Performance Work Statement, and a...
Contractor shall provide all labor, materials, & equipment necessary to to Dry-Dock and Repair the Storage Barge 792 in accordance with the attached Solicitation, the Performance Work Statement, and any Amendments. Additionally, the attached drawings are described as follows: The file named “792 Drawing Binder” is a drawing prior to the installation of the crane and deckhouse on the barge. The drawings on the barge show it is as the LD-771, but prior to the additions it was the same design. The “792 Deckhouse” drawing is of the warehouse that was built on the 792.