Gathright Dam Motor Control Center Electrical Repairs in Covington, Virginia
The U.S. Army Corps of Engineers – Norfolk District anticipates a future firm-fixed-price construction contract for the Gathright Dam Motor Control Center Electrical Repairs Project in Covington, Virginia. The work includes replacing 480-volt motor control centers MCC2 and MCC3, incidental conduit and transformer XFMR-3 replacement, and comprehensive control-system modernization with PLC/RIO/HMI panels, network wiring, instrumentation, lighting updates, PLC programming, and Sutron system reprogramming. Operations must be carefully phased and coordinated because facility buildings will remain occupied, and there is an optional warehouse-style high-bay luminaire lifting mechanism. The estimated construction price range is between $1,000,000 and $5,000,000, with an approximate 360-calendar-day period of performance from Notice to Proceed. This is a sources sought notice only, not a request for proposals, and no solicitation, specifications, or drawings are currently available.