Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W9123621B2004
PLEASE SEE AMENDMENT 0001 FOR UPDATED BIDDER INQUIRY KEY LOCATED WITHIN THE SOLICITATION POSTING The scope of work includes all necessary labor, materials, equipment and other services, as required to...
PLEASE SEE AMENDMENT 0001 FOR UPDATED BIDDER INQUIRY KEY LOCATED WITHIN THE SOLICITATION POSTING The scope of work includes all necessary labor, materials, equipment and other services, as required to clean, replace sealant, conduct repointing and conduct repairs in Courts 7, 8 and 9 at Arlington National Cemetery (ANC). This project will also include the replacement of the roof of the west committal shelter as well minor cosmetic repairs to maintain an appearance consistent with that of the west committal shelter. ANC Columbarium Courts 7 and 9 will be cleaned in their entirety. Court 8 was cleaned during the second phase of the Columbarium Project. Repointing, sealant, Dutchmen, and other repairs will be jointly identified by ANC Engineering and the USACE field office. The roof membrane of the west committal shelter will be removed and replaced. The roof drains and drain covers will be cleaned and repaired as necessary. Damaged finishes will be removed and repaired, the finish type will match the east ceremonial shelter. The electrical box cover will be removed and replaced, outlets and any fixtures will be removed and replaced as well. Limestone claddings will be treated, cleaned or re-corked. The solicitation will be issued in accordance with FAR 14 Sealeb Bid with Definitive Responsibility Criteria (IFB w/ DRC). the anticipated construction completion date is 255 days after the Notice to Proceed.