Tar Lake Superfund
The U.S. Army Corps of Engineers (USACE) Detroit District is seeking a contractor for a Firm-Fixed-Price environmental services contract for the Tar Lake Superfund project in Mancelona Township, Michigan. The project involves excavating approximately 172,500 tons of contaminated soil, backfilling with clean imported soils, installing new biosparge wells, and constructing an approximately 160-square-foot pre-engineered structure to house biosparge system compressors. Ancillary work includes abandoning existing groundwater monitoring wells, installing new monitoring wells, erosion control measures, a utility survey to locate existing bio-sparge system piping, confirmation soil sampling, and site restoration. Amendments have updated the specifications, scoping statement, and wage determinations, and changed CLIN 0007 from Environmental Remediation Services to Construction.