Monroe Harbor Advanced Maintenance Dredging
W911XK26BA013
This project involves the mechanical dredging of Monroe Harbor to specified depths in the main channel, a section near the wall, and the turning basin. The dredged material must be placed in Cell 3 at the Pointe Mouillee Confined Disposal Facility, with no discharge allowed there. The work is to be performed at Monroe Harbor. The description does not specify a budget or timelines for performance.