Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W911XK19B0011
A. Provide all work, materials, equipment, labor, supervision, management, and administration as indicated herein, as indicated in the Drawings and Specifications, and as necessary to completely perfo...
A. Provide all work, materials, equipment, labor, supervision, management, and administration as indicated herein, as indicated in the Drawings and Specifications, and as necessary to completely perform the work as described. Work elements include the following: 1. Mobilization to the worksite on the Detroit River and to the Pointe Mouillee Confined Disposal Facility (CDF) at Berlin Charter Township, Michigan; 2. Dredging and removal of sediment materials from the Detroit River federal navigation channel; 3. Transportation and disposition of sediment materials at the Pointe Mouillee CDF, Cell 3; 4. Maintenance activities at the Pointe Mouille CDF, including installation of cross culverts between cell 2 and cell 3, removal and replacement of two (2) dolphins by trestle structure near cell 5, installation of four (4) new dolphins near cell 5 platform, stone placement on all CDF's dike crests, repair of seven (7) known depressions located on the riverward perimeter dikes of cells 1 through 3 and site brush clearing and mowing along the lakeward perimeter dikes and the cross dikes of cells 1, 2, 3, 4, and 5 of the CDF; 5. Verification surveys; and 6. Demobilization from the work area at the completion of the project.