Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
The U.S. Army Corps of Engineers, Pittsburgh District, seeks complete replacement of the standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio, including rerouting existing vent and exhaust pipes through the masonry side wall, installing a new gutter system, and integrating a certified non-penetrating Lightning Protection System. The project is a non-commercial construction effort with an estimated value between $150,000 and $350,000 and will result in one firm-fixed-price contract. Work must be completed within 365 calendar days after written Notice to Proceed. The RFQ is expected on or about 4 September 2026 via PIEE/SAM.gov, with anticipated award on 13 November 2026. Evaluation will be best value to the Government based on price and past performance under NAICS 238160.