Motor Control Panels
The U.S. Army Corps of Engineers, Pittsburgh District, is seeking small business capabilities for a potential requirement to engineer, design, fabricate, test, and deliver sixteen replacement motor control panels for the Hildebrand, Morgantown, and Opekiska Lock and Dam facilities. The panels must replace existing units in kind, integrate with existing 480 VAC three-phase wiring and remote gate-control systems, and be housed in stainless steel NEMA 4X/IP66 enclosures. Fabrication must be performed by a UL 508A-approved panel shop, and the contractor will conduct field verification at all three sites and provide a design package for government approval. Delivery of all sixteen panels is expected within approximately 240 calendar days after contract award. Interested small businesses are asked to submit a capability statement demonstrating relevant experience and confirmation that they can meet the technical, integration, and delivery requirements.
Motor Control Panels
This is a sources sought notice for market research to identify small businesses capable of supplying replacement motor control panels for the U.S. Army Corps of Engineers Pittsburgh District. The requirement covers engineering, design, fabrication, testing, and delivery of 16 panels for three facilities: Hildebrand, Morgantown, and Opekiska Locks and Dams. Panels must be stainless steel NEMA 4X enclosures, 480 VAC three-phase, and fabricated by a UL 508A-approved panel shop, with field verification and integration into existing systems. The anticipated delivery timeline is approximately 240 calendar days after contract award. Interested firms should submit a capability statement confirming their ability to meet the technical and delivery requirements.