Inactive
Historically Underutilized Business (HUBZone) Sole Source (FAR 19.13)
Notice ID:W911WN23B8019
Second and First Units, FY23 Sediment Removal, Punxsutawney Local Flood Protection Project, Mahoning Creek, Punxsutawney, Jefferson County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh D...
Second and First Units, FY23 Sediment Removal, Punxsutawney Local Flood Protection Project, Mahoning Creek, Punxsutawney, Jefferson County, Pennsylvania. The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves channel maintenance work within the River boundaries of Mahoning Creek, in the Local Flood Protection Project, in Punxsutawney, Jefferson County, Pennsylvania. More specifically, the work area is located between Pittsburgh-Buffalo Highway (US119) downstream to the terminus of the project. This project extends past the Punxsutawney Borough Sewage Plant. The major features of the requirements are identified below: The overall contract scope of work consists of furnishing all supplies, materials, equipment and labor as necessary to remove approximately 6,000 cubic yards of sediment that will be disposed of at a properly permitted facility and to restore the channel to as-built conditions in accordance with the Drawings and Specifications. These sediment deposits will be sampled, removed, and disposed of in accordance with current State and Federal regulations including sampling and sediment control. This work will occur over a length of approximately 11,000 linear feet of river channel. The work area can be accessed from two (2) existing ramp locations at South Gilpin Street and Mulberry Alley. The work shall be completed within 365 calendar days after receipt of the written Notice to Proceed. **NOTE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?. 11/9/23 - BID OPENING HELD.