Electrical Upgrade BLDG 1002
W911SG26RA024
The project involves installing twelve new electrical outlets in a specified layout across the north, east, west, and south walls, plus center posts, along with one quad receptacle and a standard duplex outlet. An external generator transfer switch will also be installed. All outlets will be routed to a centrally located junction box on the east wall, with conduits and hardware properly supported and secured. Materials must be UL-listed and comply with NEC and local codes. Work will be performed at bldg. 1002 MFGI operation center, Pleasanton Rd, Ft. Bliss, TX.