Remove & Replace Dishwasher BLDG 20226
The contract involves removing and replacing a commercial dishwasher, food tray accumulator, and water heat booster at a dining facility on Fort Bliss, TX, with a firm-fixed-price award. The performance location is within Fort Bliss, TX, and the contract duration is 180 days after notice to proceed. The estimated budget falls between $250,000 and $500,000 (magnitude of construction), and the opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The contractor must comply with FAR Clause 52.219-14(e)(3), limiting subcontracting to no more than 85% of the contract amount (excluding materials) to non-similarly situated entities. The work includes all labor, materials, and compliance with regulatory codes, with the solicitation expected to be posted on SAM.gov.