Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001

8(a) Set-Aside (FAR 19.8)
Notice ID:W911SG26RA011

This project involves removing existing flooring and installing durable vinyl flooring in nine rooms (approximately 1,500 sq ft total) within building 1001. The work includes demolition, material disposal, subfloor preparation, and installation of new flooring and vinyl base. The contractor is responsible for moving all furniture as needed. No specific budget amount or performance timeline is mentioned. The location for performance is building 1001, rooms 114-120, 122, and 124.

Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001

8(a) Set-Aside (FAR 19.8)
Notice ID:W911SG26RA011

This project involves removing existing flooring and installing durable vinyl flooring in nine rooms (approximately 1,500 sq ft total) within building 1001. The work includes demolition, material disposal, subfloor preparation, and installation of new flooring and vinyl base. The contractor is responsible for moving all furniture as needed. No specific budget amount or performance timeline is mentioned. The location for performance is building 1001, rooms 114-120, 122, and 124.

Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001

8(a) Set-Aside (FAR 19.8)
Notice ID:W911SG26RA011

This project involves removing existing flooring and installing durable vinyl flooring in nine rooms (approximately 1,500 sq ft total) within building 1001. The work includes demolition, material disposal, subfloor preparation, and installation of new flooring and vinyl base. The contractor is responsible for moving all furniture as needed. No specific budget amount or performance timeline is mentioned in the description. The location for performance is building 1001, rooms 114-120 and 122-124.

Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001

8(a) Set-Aside (FAR 19.8)
Notice ID:W911SG26RA011

This project involves removing existing flooring and installing durable vinyl flooring in nine high-traffic rooms (rooms 114-120, 122, and 124) within building 1001. The work includes demolition, material disposal, subfloor preparation, and installation of new vinyl flooring and base, covering approximately 1,500 square feet. The contractor is responsible for moving all furniture as needed. No specific timelines or budget amounts are mentioned in the description. The location for performance is building 1001, with the specific rooms listed.

Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001

8(a) Set-Aside (FAR 19.8)
Notice ID:W911SG26RA011

This project involves removing existing flooring and installing durable vinyl flooring in nine high-traffic rooms (totaling approximately 1,500 sq ft) within Building 1001. The work includes demolition, material disposal, subfloor preparation, and installation of new vinyl flooring with a 4-inch vinyl base. The contractor is responsible for moving all furniture as needed. No budget amount or performance location beyond the building number is specified. No submission or non-bid timelines are mentioned.

Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001

8(a) Set-Aside (FAR 19.8)
Notice ID:W911SG26RA011

This project involves removing existing flooring and installing durable vinyl flooring in nine rooms within building 1001. The work includes demolition, material disposal, subfloor preparation, and installation of new flooring and vinyl base. The contractor must move all furniture as needed. The total area is approximately 1,500 square feet. No budget, timeline, or performance location beyond the building number is specified.

Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001

8(a) Set-Aside (FAR 19.8)
Notice ID:W911SG26RA011

This project involves removing existing flooring and installing durable vinyl flooring in nine high-traffic rooms (totaling approximately 1,500 sq ft) within building 1001. Work includes demolition, material disposal, subfloor preparation, and installation of new vinyl flooring with a 4-inch vinyl base. The contractor is responsible for moving all furniture as needed. No specific budget amounts or performance timelines are mentioned in the description. The location for performance is building 1001, with rooms 114-120, 122, and 124.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W6QM MICC-FT BLISS
  PSC   7220 FLOOR COVERINGS


Data sourced from SAM.gov. View Official Posting »