Remove and Install Vinyl Composite Tile (VCT) Flooring BLDG 1001
W911SG26RA011
This project involves removing existing flooring and installing durable vinyl flooring in nine high-traffic rooms (totaling approximately 1,500 sq ft) within building 1001. Work includes demolition, material disposal, subfloor preparation, and installation of new vinyl flooring with a 4-inch vinyl base. The contractor is responsible for moving all furniture as needed. No specific budget amounts or performance timelines are mentioned in the description. The location for performance is building 1001, with rooms 114-120, 122, and 124.