B2472 Kitchenette Installation, Ft Bliss, TX

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:W911SG26BA012

This project involves installing a kitchenette in Building 2472 at Fort Bliss, Texas. The estimated construction cost is between $250,000 and $500,000, with a firm-fixed-price contract expected. It is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 236220. The awardee must provide a superintendent at all times during work; this key position cannot be subcontracted and must be directly employed by the prime contractor. All work must be performed simultaneously, and bid, performance, and payment bonds are required.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W6QM MICC-FT BLISS
  PSC   Z2FC REPAIR OR ALTERATION OF TROOP HOUSING FACILITIES


Data sourced from SAM.gov. View Official Posting »

B2472 Kitchenette Installation, Ft Bliss, TX

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:W911SG26BA012

This project involves installing a kitchenette in Building 2472 at Fort Bliss, Texas. It is a 100% competitive set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS 236220, with a small business size standard of $45 million. The estimated construction budget is between $250,000 and $500,000, and the resulting contract will be firm-fixed-price. Bid, performance, and payment bonds are required, and the prime contractor must provide a superintendent who works directly for them and remains on-site while work is performed. All work must be performed simultaneously.

B2472 Kitchenette Installation, Ft Bliss, TX

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:W911SG26BA012

This opportunity is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses to install a kitchenette in Building 2472 at Fort Bliss, Texas. The estimated construction budget is between $250,000 and $500,000, and the resulting contract will be firm-fixed-price. A bid guarantee is required, and performance and payment bonds are also necessary. The prime contractor must provide a superintendent on-site at all times during work, and this key position cannot be subcontracted. All work must be performed simultaneously.