Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W911SG25QA014
The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, maintain, tear down, and remove Dump Trucks & Backhoes with Trailers at Fort Irwin, ...
The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, maintain, tear down, and remove Dump Trucks & Backhoes with Trailers at Fort Irwin, CA. Prior to arrival, coordinate with Government Representative. The Contractor shall ensure Dump Trucks & Backhoes with Trailers are delivered with all necessary original equipment parts IAW the operator’s manual and have a full tank of fuel. All parts must be fully functional IAW the operator’s manual. All Dump Trucks & Backhoes with Trailers are to be delivered to designated locations inside training areas. The Designated Government Representative will provide the contractor each location Quantity: Two (2) Dump Trucks & Two (2) Backhoe with Trailer Delivery Location: LSA Warrior (RUBA)