UPGRADE MULTIPLE CAMPSITES AT PINEVIEW CAMPGROUND
This amendment answers vendor questions, replaces Attachment 3 with revised drawings, and posts the site visit sign-in sheet with attendees. The revised drawings update sheet C5.1 detail 3 for concrete pad pavement in Areas 2 and 3, adding re-bar and control joint information. Attachment 7, a Supplemental Sketch, was also added for questions Q19–Q22.