Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W911SA20B2018
The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to install copper, and fiber optic outside cable plants from designated locations to designated locatio...
The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement to install copper, and fiber optic outside cable plants from designated locations to designated locations on Fort McCoy, Wisconsin. Work to be performed will be within the North American Industry Classification System (NAICS) Code 237130 with a small business size standard of $39.5 million. Solicitation W911SA20B2018 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). It is anticipated that this requirement will be awarded as a single award, indefinite delivery, indefinite quantity, firm fixed-price contract. This solicitation will be a 100% Total Small Business Set aside. Project magnitude is between $1,000,000 and $5,000,000. Period of Performance: will be instructed on task orders. MICC Fort McCoy intends to issue the solicitation within 45 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted. Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. SOLICITATION POSTED 11/16/2020 11/17/2020 Bids are due on 12/17/2020 at 11AM CST, as stated on Page 1 of the SF 1442- please see procedures explained on page 12 of the solicitation on how to submit a bid electronically. Paper copy Bids are not being accepted due to COVID-19. (the due date stated on page 9 is incorrect and will be corrected) 12/08/2020 Amendment 0001 posted today - please thoroughly read over the Amendment. thanks 12/08/2020 The price of the line items on the Bid Schedule should include the price of the item to be installed and labor involved, at least. Your firm will need to work that out when preparing the Bid. Also, there is not a separate line items for mobilization, Please prepare your bid accordingly. THANK YOU BID ABSTRACT posted 12/22/2020 MMH - this is in two documents - please look at both documents. thanks