Thermal Arc Sound Attenuation Booth
Amendment 0001 CLIN Correction. Thermal Arc Booth Salient Characteristics MCAAP Engineering will verify and validate the proposal from the vendor prior to award.Scope: Thermal Arc Sound Attenuation Bo...
Amendment 0001 CLIN Correction. Thermal Arc Booth Salient Characteristics MCAAP Engineering will verify and validate the proposal from the vendor prior to award.Scope: Thermal Arc Sound Attenuation Bo...
MCAAP requires Thermal Arc sound attenuation booths in two configurations, including models QT100118128TA or similar and QT77102116TA or similar, with all parts and hardware for erection in two halves and doors shipped loose. The booths must have 18-gauge galvanized flat panel construction, single-slope roof, Rockwool insulation, galvanized perforated interior liner, internal plenum, welding arm offset/cutout, doors and hardware, mounting plates, anchoring hardware, and internal bracing. Onsite installation, mounting, building air, and auxiliary components such as exhaust fans, lights, and switches are provided by others/MCAAP. Before award, MCAAP Engineering Support Division will validate and approve the contractor’s equipment concept, so offerors must submit a detailed technical description covering every required feature plus conceptual drawings, with approval drawings requested. 3D models in native SolidWorks, IGES, and/or STEP are requested within two weeks after award.
MCAAP is seeking a Thermal Arc sound attenuation booth (Qualitech QT100118128TA or similar and QT77102116TA or similar) with all necessary parts and hardware for a fully erected, two-half-shipped booth. The booth must have 18ga galvanized flat panel construction, a single-slope roof, Rockwool insulation, perforated interior liner, doors/hardware/switches, internal plenum, welding arm offset/cutout, and floor anchoring. Onsite installation, mounting, exhaust fan, lights, and switches are by others, while MCAAP will provide building air, installation, and auxiliary components. A detailed technical description and approval/conceptual drawings must be submitted and approved by MCAAP Engineering prior to award, and 3D models in native SolidWorks, IGES, and/or STEP are requested within two weeks after award.