VFDs for bridge cranes
This project requires a turnkey solution to provide and install Variable Frequency Drives on two specified indoor bridge crane hoists, ensuring compliance with strict hazardous location electrical classifications. The period of performance is six months, beginning March 1, 2026. The contractor is responsible for all phases, including a site assessment, equipment procurement, installation, testing, commissioning, documentation, and training. The work involves installing the VFDs and two additional protective enclosures on the crane frames at a location with an approximate 30-foot hook height. All work must comply with NFPA 70 and OSHA requirements.