Concrete and Delivery with Labor
W911S226U2273
The 593D CSC requires 57 cubic yards of concrete to be delivered and poured over a two-day period. The vendor must supply the concrete and a mixer, but no labor, as soldiers will perform the work. The concrete must achieve a specified compressive strength of 3,000 psi at 28 days, with a slump of no more than 3 inches and an air content between 4.5% and 7.5%. The final cured color must match adjacent concrete. No specific budget, performance location, or non-bid timelines are detailed in the description.