FCC Uninterruptible Power Supply Installation

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:W911S026QA013

The contractor must furnish all parts, labor, materials, tools, equipment, supervision, and engineering services to disconnect and dispose of the old UPS and hardwire install/connect a customer-supplied UPS at Building 950, Fort Eustis, VA. The installed UPS will provide backup power for critical mods and sims systems during power loss or interruption. Full scope details are provided in the attached RFQ and PWS. Amendment 1 provides industry Q&A responses in an attached document.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W6QM MICC-FDO FT EUSTIS
  PSC   INSTALL OF ELECT-ELCT EQ


Data sourced from SAM.gov. View Official Posting »

FCC Uninterruptible Power Supply Installation

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W911S026QA013

The Contractor shall provide all necessary parts, labor, materials, tools, equipment, supervision, and engineering services to disconnect and dispose of old UPS; and hardwire install and connect a cus...

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W6QM MICC-FDO FT EUSTIS
  PSC   N059 INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
LOCATION: Not Given
Primary Contact
LAUREN BEASLEY
Not Given
Alt Contact
Curtis Arthur
757-***-8159


Data sourced from SAM.gov. View Official Posting »