FCC Uninterruptible Power Supply Installation
The contractor must furnish all parts, labor, materials, tools, equipment, supervision, and engineering services to disconnect and dispose of the old UPS and hardwire install/connect a customer-supplied UPS at Building 950, Fort Eustis, VA. The installed UPS will provide backup power for critical mods and sims systems during power loss or interruption. Full scope details are provided in the attached RFQ and PWS. Amendment 1 provides industry Q&A responses in an attached document.