Douthit Gunnery Complex Fiber Optic Repair

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W911RX26QA038

The service involves replacing in-ground fiber optic cable at two locations on the Douthit Gunnery Range at Fort Riley, Kansas, requiring trenching to a depth of 4-6 feet for approximately 80 meters and 70 meters of cable, respectively, including a junction block repair. The period of performance is tied to the training season, with work scheduled when the complex is not in use, and performance may need to start immediately on May 11, 2026. The contract will be a Firm-Fixed-Price award based on a best-value trade-off between price, technical acceptability, and scheduling ability. Payment will be made only after all services are completed. To be considered, offerors must fully complete and submit two specified documents, detailing their ability to start work immediately and the required downtime for the range.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W6QM MICC-FT RILEY
NAICS Not provided
  PSC   (blank) INSTALL OF POWER DISTRIBUTION EQ
LOCATION: Not Given
Primary Contact
Noah Younger
520-***-8003

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »