Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (FY26)

Inactive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:W911QY-26-R-GROUNDWATER

This is a requirement for environmental remediation services, including groundwater pump and treatment system operation and semi-annual monitoring, at three specified sites at the U.S. Army NSSC in Natick, MA. The government will award a single, firm-fixed-price contract with a five-year period of performance consisting of one base year and four option periods. This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 562910 with a $25 million size standard. The evaluation factors for award are Technical Capability, Price, and Past Performance, with the intent to award to the proposal representing the Best Value to the Government.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W6QK ACC-APG NATICK
  PSC   F108 ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION
LOCATION: Not Given
Primary Contact
Chris Welsh
Not Given
Alt Contact
Alejandro Ayala
Not Given

Links (0)

Attachments (22)

Document
Size
Access
Updated
Q and A - No. 2 - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (05 FEB 2026).pdf
108.62 KB
Public
Feb 5, 2026
Q and A - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (22 JAN 2026).pdf
141.44 KB
Public
Jan 22, 2026
Groundwater Solicitation - W911QY26RGROUNDWATER (UPDATED 22 JAN).pdf
706.89 KB
Public
Jan 22, 2026
Attachment 1 - Performance Work Statement (PWS) - Final (UPDATED 22 JAN).pdf
439.87 KB
Public
Jan 22, 2026
Attachment 2 - CLIN Structure (UPDATED 22 JAN).xlsx
15.47 KB
Public
Jan 22, 2026
QASP - CERCLA Groundwater Pump and Treatment System Operation and Semi-Annual Groundwater Monitoring (16 JAN 2026).pdf
309.23 KB
Public
Jan 22, 2026
Record of Decision T-25 Area Ground Water (APR 2001).pdf
6.78 MB
Public
Jan 22, 2026
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 1 of 2.pdf
6.2 MB
Public
Jan 22, 2026
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 2 of 2.pdf
19.61 MB
Public
Jan 22, 2026
Federal Facilities Agreement.pdf
585.56 KB
Public
Jan 22, 2026
Draft Final Ops. and Maint. Manual OU-1 (T-25 Area, Bldgs 22, 36 Area, and Bldgs 63, 2, 45 Area).pdf
33.54 MB
Public
Jan 22, 2026
Final Explanation of Significant Differences for T-25 Area Groundwater (Operable Unit 1) US Army SSC.pdf
4.98 MB
Public
Jan 22, 2026
Final Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP) U.S. Army SSC.pdf
4.37 MB
Public
Jan 22, 2026
Final 2017 Third Five Year Review Report U.S. Army Soldier Systems Center, Natick MA (APR 2017).pdf
10.83 MB
Public
Jan 22, 2026
Final Optimization Plan for U.S. Army Soldier Systems Center (Sep 2018).pdf
11.57 MB
Public
Jan 26, 2026
Groundwater Remedial Optimization Work Plan - U.S. Army SSC.pdf
14.58 MB
Public
Jan 26, 2026
Event 79 (Fall 2019) and Groundwater Treatment System 2019 Annual Report for U.S. Army SSC.pdf
3.07 MB
Public
Jan 22, 2026
Groundwater Monitoring Event 81 and 2020 GWETS Annual Report.pdf
23.99 MB
Public
Jan 22, 2026
Groundwater Monitoring Event 83 and 2021 GWETS Annual Report.pdf
90.49 MB
Public
Jan 22, 2026
Groundwater Monitoring Event 85 and 2022 GWETS Annual Report.pdf
62.35 MB
Public
Jan 22, 2026
Groundwater Monitoring Event 87 and 2023 GWETS Annual Report.pdf
97.32 MB
Public
Jan 22, 2026
DRAFT Groundwater Monitoring Event 89 and 2024 GWETS Annual Report.pdf
65.15 MB
Public
Jan 22, 2026


Data sourced from SAM.gov. View Official Posting »

Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (FY26)

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:W911QY-26-R-GROUNDWATER

This is a requirement for environmental remediation services, including groundwater pump and treatment system operation and semi-annual monitoring, at three specific sites at the U.S. Army NSSC in Natick, MA. The government will award a single, firm-fixed-price contract with a five-year period of performance consisting of one base year and four option periods. This procurement is 100% set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 562910 with a $25 million size standard. Proposals will be evaluated based on Technical Capability, Price, and Past Performance for a best-value award. The contractor must provide all necessary personnel, equipment, and services to perform the work in accordance with the Performance Work Statement and CERCLA standards.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W6QK ACC-APG NATICK
  PSC   F108 ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION
LOCATION: Not Given
Primary Contact
Chris Welsh
Not Given
Alt Contact
Alejandro Ayala
Not Given

Links (0)

Attachments (21)

Document
Size
Access
Updated
Q and A - Groundwater Pump and Treatment System Operation Semi-Annual Groundwater Monitoring (22 JAN 2026).pdf
141.44 KB
Public
Jan 22, 2026
Groundwater Solicitation - W911QY26RGROUNDWATER (UPDATED 22 JAN).pdf
706.89 KB
Public
Jan 22, 2026
Attachment 1 - Performance Work Statement (PWS) - Final (UPDATED 22 JAN).pdf
439.87 KB
Public
Jan 22, 2026
Attachment 2 - CLIN Structure (UPDATED 22 JAN).xlsx
15.47 KB
Public
Jan 22, 2026
QASP - CERCLA Groundwater Pump and Treatment System Operation and Semi-Annual Groundwater Monitoring (16 JAN 2026).pdf
309.23 KB
Public
Jan 22, 2026
Record of Decision T-25 Area Ground Water (APR 2001).pdf
6.78 MB
Public
Jan 22, 2026
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 1 of 2.pdf
6.2 MB
Public
Jan 22, 2026
T-25 Area (OU-1) Ground Water Treatment System Operation and Maintenance Manual Volume 2 of 2.pdf
19.61 MB
Public
Jan 22, 2026
Federal Facilities Agreement.pdf
585.56 KB
Public
Jan 22, 2026
Draft Final Ops. and Maint. Manual OU-1 (T-25 Area, Bldgs 22, 36 Area, and Bldgs 63, 2, 45 Area).pdf
33.54 MB
Public
Jan 22, 2026
Final Explanation of Significant Differences for T-25 Area Groundwater (Operable Unit 1) US Army SSC.pdf
4.98 MB
Public
Jan 22, 2026
Final Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP) U.S. Army SSC.pdf
4.37 MB
Public
Jan 22, 2026
Final 2017 Third Five Year Review Report U.S. Army Soldier Systems Center, Natick MA (APR 2017).pdf
10.83 MB
Public
Jan 22, 2026
Final Optimization Plan for U.S. Army Soldier Systems Center (Sep 2018).pdf
11.57 MB
Public
Jan 26, 2026
Groundwater Remedial Optimization Work Plan - U.S. Army SSC.pdf
14.58 MB
Public
Jan 26, 2026
Event 79 (Fall 2019) and Groundwater Treatment System 2019 Annual Report for U.S. Army SSC.pdf
3.07 MB
Public
Jan 22, 2026
Groundwater Monitoring Event 81 and 2020 GWETS Annual Report.pdf
23.99 MB
Public
Jan 22, 2026
Groundwater Monitoring Event 83 and 2021 GWETS Annual Report.pdf
90.49 MB
Public
Jan 22, 2026
Groundwater Monitoring Event 85 and 2022 GWETS Annual Report.pdf
62.35 MB
Public
Jan 22, 2026
Groundwater Monitoring Event 87 and 2023 GWETS Annual Report.pdf
97.32 MB
Public
Jan 22, 2026
DRAFT Groundwater Monitoring Event 89 and 2024 GWETS Annual Report.pdf
65.15 MB
Public
Jan 22, 2026


Data sourced from SAM.gov. View Official Posting »