Fabricate and Install New Structural Steel Flooring System at the Watervliet Arsenal, NY
W911PT26QA066
This contract requires the design, supply, and installation of a new structural steel flooring system to support manufacturing equipment in Building 35 at the Watervliet Arsenal. The project's budget is between $25,000 and $100,000, and the period of performance is 90 days from the notice to proceed. The work is set aside for small businesses and will be a firm fixed-price contract. A site visit is scheduled for a future date. All work must comply with the provided Statement of Work and the specified wage determination.