Fabricate and Install New Structural Steel Flooring System at the Watervliet Arsenal, NY
This opportunity requires the contractor to provide design, materials, and installation for a new structural steel flooring system to support manufacturing equipment in Building 35 at the Watervliet Arsenal. The project budget is between $25,000 and $100,000, with a 90-day performance period from issuance of the Notice to Proceed. The response date has been extended to 11 May 2026 at 2:30 p.m. EST. The solicitation is set aside for small businesses and will result in a firm fixed-price contract. A site visit is scheduled for 28 April 2026 at 2:00 p.m.
Links (0)
Attachments (18)
Data sourced from SAM.gov.
View Official Posting »