Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W911PT20Q0064
To provide all labor, material, parts and equipment to update the finishes in rooms 13-17 of building 35. This includes; installing new floor tile in rooms 13, 14, 15, and 17, installing a new drop ce...
To provide all labor, material, parts and equipment to update the finishes in rooms 13-17 of building 35. This includes; installing new floor tile in rooms 13, 14, 15, and 17, installing a new drop ceiling in rooms 13, 14, and 15, and painting the walls and doors per Scope of Work # 20PW006. Also included in the scope of work is building a proper wall on the south side of room 14 near the door. The flooring replacement is all asbestos containing material and shall be abated through removal. Wage Determination General Decision Number: NY2 latest revision applies and will be incorporated at time of award. Magnitude of this Project between $100,000 and $250,000. Contracting Officer Representative is Chuck Gould 100% Payment and Performance Bonds are required. ***SITE VISIT VIA VIDEO RECORDING*** POINT OF CONTACT IS Royce Abcede DUE TO THE COVID-19 SITUATION, IN-PERSON SITE VISITS WILL NOT BE CONDUCTED. A VIDEO RECORDING OF THE JOB SITE IS AVAILABLE. CONTACT ROYCE ABCEDE THROUGH E-MAIL, royce.abcede.civ@mail.mil TO REQUEST THE ACCESS LINK TO THE VIDEO FILE.