Inactive
Notice ID:W911PT-19-Q-0052
TO COVER THE COST OF LABOR, MATERIAL AND EQUIPMENT TO TEST CYLINDER WEIGHT AND TEST ALL COMPONENTS OF THE EXISTING FIXED FIRE EXTINGUISHING SYSTEM FOR THE CO2 SYSTEMS TO BE INSPECTED AND TESTED IN THE...
TO COVER THE COST OF LABOR, MATERIAL AND EQUIPMENT TO TEST CYLINDER WEIGHT AND TEST ALL COMPONENTS OF THE EXISTING FIXED FIRE EXTINGUISHING SYSTEM FOR THE CO2 SYSTEMS TO BE INSPECTED AND TESTED IN THE FOLLOWING BUILDINGS: - 35 HEAT TREAT - 21 POST CAFETERIA - 35 MINOR PLATING - 135 ROTARY FORGE - 135 TOCCO FURNACE THERE IS A DRY CHEMICAL SYSTEMS LOCATED IN BUILDING 110, FLAMMABLE STORAGE LOCKER INSPECTION AND TESTING OF THE PROTECTO-WIRE (THERMAL DETECTION WIRE) AT BUILDING 25. CONTRACTOR SHALL CONDUCT FUNCTION TEST ALL COMPONENTS (VALVES, NOZZLES, TAMPER SWITCHES, DISCHARGE SWITCH, ALARMS, MANUAL ACTIVATION) PER PERFORMANCE WORK STATEMENT DATED 28 DECEMBER 2018, WHICH IS HEREBY ATTACHED AND INCORPORATED. Inspection: tiny_mce_marker_______ each Ballance alloted for parts and repairs (estimated):__________ Service Contract Act applies, Wage Determination: N0.15-4143 Rev10, dated 1/1/2019 and is incorporated. Technical POC is Ken Haviland THIS PROCUREMENT IS FOR ONE (1) BASE YEAR AND TWO (2) OPTION YEARS.