Inactive
Notice ID:W911KF-23-Q-0009
The contractor shall provide all material, transportation, labor, equipment, coordination, planning, and supervision necessary to replace the double wall sulfuric acid line at Building 162 located at ...
The contractor shall provide all material, transportation, labor, equipment, coordination, planning, and supervision necessary to replace the double wall sulfuric acid line at Building 162 located at the Anniston Army Depot and other pipe insulation and heat trace in accordance with the Statement of Work.