Inactive
Notice ID:W911KB23R0051
FTW453 Physical Readiness Fieldhouse. This is a Design-Build project which includes elevated four lane 200-meter indoor track, cardio and w eight training modules, locker rooms, control desk, administ...
FTW453 Physical Readiness Fieldhouse. This is a Design-Build project which includes elevated four lane 200-meter indoor track, cardio and w eight training modules, locker rooms, control desk, administrative area, lobby, laundry, an elevator, and storage. Primary facilities include special foundations, cybersecurity, and antiterrorism/force protection (AT/FP) measures, building information systems, fire protection and alarm systems, intrusion detection system (IDS) installation, and energy monitoring control systems (EMCS) connection.