Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W90WL520Q0011
Provide materials and erection plans for metal canopy to cover and span existing building and provide for traffic lanes. (Sketch is provided to illustrate) Structure to be erected on Government instal...
Provide materials and erection plans for metal canopy to cover and span existing building and provide for traffic lanes. (Sketch is provided to illustrate) Structure to be erected on Government installation in Tooele, UT 84074. Installation of materials to be done by Government Personnel. The contractor shall provide a steel canopy with supporting structural materials and all fastening devices to the following characteristics: 1. Dimensions: 50 ft. length, 100 ft. width, eave height 20 ft. 2. Roof slope: ½”:12 3. Frame type: Clear span gabled rigid frame. 4. Footings to extend 48 in. above finished grade. 5. Color to be selected and provided by Customer. (To be painted by Customer) 6. Include gutter and downspouts. 7. Full ceiling liner panel similar to referenced support illustration. Building includes full ceiling liner panel. Panel is 26 gage Longspan III panel in “Polar White” 8. Include parapets. 9. Labor to install the canopy and on site is not included. (To be erected by Government Personnel.) 10. Structural engineering that shows footing depth and reinforcement. 11. Include shipping in costs. Unloading will be done by Government. 12. Standard gutter and downspouts at both sidewalls. 13. Parapet: Building includes a parapet the full length of the Left Endwall. Top of parapet elevation is 23’-0”. Parapet includes back panels and parapet cap. 14. Roof: 26 gage Longspan III panel with silicone polyester color finish. Color to be selected by Government. Provide supporting conceptual drawings with proposals. Government Personnel will complete installation to structural engineering plans and data as provided with purchased materials package.