Removal of vehicle lifts and repair floor at Building #817 (AFSBN-NEA), Camp Carroll
W90VN919R0041
Please see the attached RFP W90VN9-19-R-0041 with Amendment #0001. The closing date and time is by 24 May 2019, 01:00 pm (Korean Local date/time).