Inactive
Notice ID:W90VN824R0064
Installation of Tent on Camp Hovey (MATOC Only) Amendment 0001 Posted on 6 AUG 2024 The Purpose of this Amendment is to: 1. Change the w ord "Install" to "Provide" in the specifications 2. Update the ...
Installation of Tent on Camp Hovey (MATOC Only) Amendment 0001 Posted on 6 AUG 2024 The Purpose of this Amendment is to: 1. Change the w ord "Install" to "Provide" in the specifications 2. Update the Architecture Draw ings 3. Delete the requirement to Remove structure after 3 years 4. Explicate the Tensions Fabic Structure is and w ill remain Government Property after Government acceptance of Performance The contractor must complete all work within the construction period of 75 days. 2.2.1. Civil Work 2.2.1.1. Connect 150mm PVC sewer line to new movable toilet 2.2.1.2. Connect 50mm PVC water line to new movable toilet using 50mm tapping saddle. 2.2.1.3. Construct sidewalk. 2.2.1.4. Restore granite curb. 2.2.1.5. Restore AC pavement. 2.2.1.6. Restore solid sodding w/topsoil. TP I-1 2.2.2. Architectural Work 2.2.2.1. Provide a TFS (Tension Fabric Structure) tent (55m x 20m) and install on existing concrete foundation. (TFS tent need a 3-year warranty for maintenance) 2.2.2.2. Install doors and frames including hardware sets as shown on floor plan and schedule. 2.2.2.3. Install partitions as shown on floor plan and schedule. 2.2.2.4. Apply epoxy coating with non-slip grits on existing concrete floor. 2.2.2.5. Furniture (tables & chairs) and equipment will be moved to tent or temporary spaces. 2.2.2.6. Provide disconnection and connection of equipment. 2.2.2.7. Provide new movable toilet facility including all toilet accessories as shown on dwg. 2.2.2.8. Connect mechanical and electrical utility line to new toilet. 2.2.3. Mechanical Work 2.2.3.1. Relocate existing kitchen equipment from DFAC to tent as shown on drawings. 2.2.3.2. Connect to kitchen equipment and utility line and all associated accessories for temporary tent as shown on drawings. 2.2.3.3. Install new dishwasher, table roller, pre-washing table and clean dish table and all associated accessories in the temporary tent as shown on drawings. 2.2.4. Electrical Work 2.2.4.1. Provide led lighting fixtures, exit signs at each exit, emergency lights and switches with associated wiring for tent DFAC