Inactive
Notice ID:W90VN824R0057
Oppurtunity available to Area I &II MATOC Contractors. 2.1.1. Civil Work 2.1.1.1. Repair all existing rail track leveling and lining. 2.1.1.2. Drive all loose spikes and repair/tighten all missing/loo...
Oppurtunity available to Area I &II MATOC Contractors. 2.1.1. Civil Work 2.1.1.1. Repair all existing rail track leveling and lining. 2.1.1.2. Drive all loose spikes and repair/tighten all missing/loose bolts on existing track. 2.1.1.3. Replace switch tie including necessary accessories in switch #1. 2.1.1.4. Replace ballast stone along 10.0 LM track near bldg#1523 crossing. 2.1.1.5. Realign guard rail to keep space 39~45mm in switch #2. 2.1.1.6. Add and temp ballast stone along all track in Cp Casey.