Notice ID:W90VN619R0032
PRINCIPLE WORK FEATURES (INSTALLATION): This project includes, but is not limited to, the Following principles features of installation. (See attached floor plan) General: Roof insulation will be cove...
PRINCIPLE WORK FEATURES (INSTALLATION): This project includes, but is not limited to, the Following principles features of installation. (See attached floor plan) General: Roof insulation will be covered with "batt blanket insulation 4" thick include, roof liner and vapor barrier , Local vendor MURO approved 07-21-16, and Exterior insulation finish system(EIFS) on exterior wall include accessories &base coat and Building No, local vendors Hyosung, Teraco-Korea, Baroco were approved 07-24-00. 1) B-1830 Roof insulation: N/A. EIFS wall: Both building (CMU + CMU), down spout. 2) B-1833 Roof insulation: Bay area only. EIFS wall: Both building (CMU + steel panel), down spout Replace rain gutter 50lf. 3) B-1836 Roof insulation: All. EIFS wall: Building (steel panel), down spout. Replace rain gutter 160lf.