Inactive
Notice ID:W90VN6-24-R-0026
GENERAL: The work to be performed for completion of this Work Plan project shall be as described in general below. The contractor shall provide all labor, tools, equipment, supplies, and any other res...
GENERAL: The work to be performed for completion of this Work Plan project shall be as described in general below. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications. All work shall be completed IAW APPENDIX “A” As-built drawings, and APPENDIX “B” Specifications associated with this project. Contract Type: This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The definition of Work Plan is a task order in which the contractor must develop 100% plan and design, and provide all design drafting, management, supervision, plant, labor, materials, equipment, and any other resources necessary to complete this project based on the Government provided 30% of concept design and scope of work contained herein and as included in the as-built drawings and specifications. The task order proposal submission requirements are as below: