Inactive
Notice ID:W90VN6-21-R-0036
STATEMENT OF WORK SMYU 21-1078 REPLACE BARE COPPER WIRE WITH INSULATED WIRE FOR B FEEDER OSAN AB, ROK 1. DESCRIPTION: The work to be performed for completion of this project shall be as described in g...
STATEMENT OF WORK SMYU 21-1078 REPLACE BARE COPPER WIRE WITH INSULATED WIRE FOR B FEEDER OSAN AB, ROK 1. DESCRIPTION: The work to be performed for completion of this project shall be as described in general below. 1.1. The contractor shall provide all design drafting, management, supervision, plant, labor, materials, equipment, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications. 1.2. All work shall be completed IAW drawings and specifications. 2. PRINCIPLE FEATURES: This project is K-work (Repair and Maintenance) and also includes the following principle features.