Power Distribution and Illumination Systems, Electrical (PDISE)
The Army is conducting an RFI/sources-sought market survey for a potential build-to-print requirement to manufacture, assemble, test, and deliver four PDISE end items—M200, M100, M40, and M46—while excluding the M60 distribution system. The requirement includes First Article inspection/preproduction testing, environmental qualification, military packaging, configuration control, quality management, and supply-chain/lead-time planning for ruggedized tactical power distribution equipment built to Government TDPs. First Article Preproduction units (two per configuration) are targeted for fabrication by 180 days after contract award and FAT completion/reporting by 360 days after award. The Government seeks to assess qualified large and small business sources under NAICS 335999 and 335313, including capacity, surge potential, past performance, and feasibility of small business set-asides. Vendors are asked to provide quantity-based ROM pricing for 1–50, 51–100, and 101–200 units for each end item and to identify pricing assumptions and long-lead considerations, with responses used only for planning and acquisition-strategy development.