RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO

Notice ID:W51DQV26RA002

This is a firm-fixed-price design-bid-build construction contract with an estimated project magnitude between $300,000,000 and $400,000,000. The NAICS code is 237990, with a small business size standard of $45 million. An organized site visit has been scheduled, though specific details are referenced in another section. Note that not all real estate rights for the entire construction site have been obtained yet, but outstanding rights will be secured before the full notice to proceed is issued. The location for performance of services is not specified in this description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SR TF VIPR
  PSC   Y1KB CONSTRUCTION OF CANALS


Data sourced from SAM.gov. View Official Posting »

Rio Del La Plata Flood Control Project, Supplemental Contract 1, Dorado and Toa Baja, Puerto Rico.

Inactive
Notice ID:W51DQV26RA002

This project involves constructing levees, channel widening, and drainage features to protect Toa Baja and Dorado, Puerto Rico from flooding. The estimated construction cost is between $250,000,000 and $500,000,000. The performance period for completion is 1,619 calendar days from the Notice to Proceed. Work must comply with Puerto Rico Highway and Transportation Authority standards, and an organized site visit will be provided with the solicitation. The contract will be awarded as a single firm-fixed-price contract based on best value.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SR TF VIPR
  PSC   CONSTRUCTION OF CANALS
LOCATION: Not Given
Primary Contact
Jaclyn Yocum
Not Given
Alt Contact
Meranda Booth
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »

Rio Del La Plata Flood Control Project, Supplemental Contract 1, Dorado and Toa Baja, Puerto Rico.

Inactive
Notice ID:W51DQV26RA002

This project involves constructing flood control structures, including levees, channel widening, and culverts, for municipalities in Puerto Rico. The estimated construction budget is between $250 million and $500 million. The performance period for completion is 1,619 calendar days from the Notice to Proceed. The contract will be a firm fixed-price award evaluated on a best-value basis, and an organized site visit is planned. Small businesses are encouraged to consider teaming arrangements to meet the financial requirements.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W2SR TF VIPR
  PSC   Y1KB CONSTRUCTION OF CANALS
LOCATION: Not Given
Primary Contact
Jaclyn Yocum
Not Given
Alt Contact
Meranda Booth
Not Given

Links (0)

Attachments (0)


Data sourced from SAM.gov. View Official Posting »