Notice ID:W519TC25RA021
Provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and t...
Provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. These items shall include all materials and labor necessary to make the equipment safely operational and to meet all relevant industry and national standards, per the requirements identified within this document.