REPLACE AC SYSTEM B3417, JBPHH-HI
The project involves removing two existing Air Handler Units (AHUs) and supplying and installing two new ones (43.75 and 50 nominal tons) at Building 3417 on the Hawaii Air National Guard campus at JBPHH-HI. The contractor must ensure proper connection to the existing HVAC duct system and digital control system, and provide temporary cooling during each AHU replacement. The anticipated period of performance is 365 days. A site visit is scheduled for 21 July 2026 at 0830 HST, and questions must be submitted by 23 July 2026. This acquisition is set aside for small business concerns.