REPLACE AC SYSTEM B3417, JBPHH-HI
W50SLF-26-R-A002
This project requires removing two existing Air Handler Units (AHUs) and supplying and installing two new ones in Building 3417 on the Hawaii Air National Guard campus at JBPHH-HI. The contractor must connect the new AHUs to the existing duct system and digital controls, and provide temporary cooling during replacement. The anticipated period of performance is 365 days. The work will be performed on the first floor within the existing mechanical rooms. This acquisition is set aside for small business concerns.