REPLACE AC SYSTEM B3417, JBPHH-HI

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50SLF-26-R-A002

The project involves removing two existing Air Handler Units (AHUs) and supplying and installing two new ones (43.75 and 50 nominal tons) at Building 3417 on the Hawaii Air National Guard campus at JBPHH-HI. The contractor must ensure proper connection to the existing HVAC duct system and digital control system, and provide temporary cooling during each AHU replacement. The anticipated period of performance is 365 days. A site visit is scheduled for 21 July 2026 at 0830 HST, and questions must be submitted by 23 July 2026. This acquisition is set aside for small business concerns.

REPLACE AC SYSTEM B3417, JBPHH-HI

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50SLF-26-R-A002

This project requires removing two existing Air Handler Units (AHUs) and supplying and installing two new ones in Building 3417 on the Hawaii Air National Guard campus at JBPHH-HI. The contractor must connect the new AHUs to the existing duct system and digital controls, and provide temporary cooling during replacement. The anticipated period of performance is 365 days to account for lead times. The acquisition is set aside for small businesses. Performance will take place on the first floor of the facility in the existing mechanical rooms.

REPLACE AC SYSTEM B3417, JBPHH-HI

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50SLF-26-R-A002

This project requires removing two existing Air Handler Units (AHUs) and supplying and installing two new ones in Building 3417 on the Hawaii Air National Guard campus at JBPHH-HI. The contractor must connect the new AHUs to the existing duct system and digital controls, and provide temporary cooling during replacement. The anticipated period of performance is 365 days. The work will be performed on the first floor within the existing mechanical rooms. This acquisition is set aside for small business concerns.