USEB262315 - B302 ISRG Ops HVAC Increase
This opportunity is for an HVAC project serving the Building 302 Intelligence Operations Floor and adjacent rooms within an accredited ICD 705 facility at Roland R. Wright Air National Guard Base in Salt Lake City, Utah. The work includes installing a new 10 or 15-ton ducted split heat pump system, adding an energy recovery ventilator, rebalancing an existing AHU-1, and demolishing existing rooftop and computer room AC units with associated roof work. It is a total small business set-aside under NAICS 238220 with a $19M size standard, and a single award will be made from evaluated quotes. A formal site visit will be held at the base, and attendance is highly encouraged to verify conditions and take measurements. Review all amendment documentation, as it includes administrative updates, vendor questions, and technical attachments relevant to this requirement.
Links (0)
Attachments (20)
Data sourced from SAM.gov.
View Official Posting »