118th Wing B747 Auditorium and 2nd Floor Bathroom Remodel
W50S9726BA003
This project involves remodeling the B747 Auditorium and second-floor restroom at Berry Field Air National Guard Base in Nashville, Tennessee. The estimated construction cost is between $500,000 and $1,000,000, and the contract is 100% set aside for small businesses. Performance will occur at the 118 Wing Berry Field ANGB in Nashville, TN 37217. Bidders must use the DoDIN Approved Product Listing for auditorium equipment, with no substitutions allowed. A pre-bid conference site visit is strongly encouraged; details are provided in the solicitation.