Upgrade UPS & Cooling System

Inactive Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S8W-26-Q0001

This opportunity requires a contractor to uninstall outdated equipment and install new Uninterruptible Power and Cooling Distribution units at 217 Dell Range Blvd, Cheyenne, WY 82009. Key tasks include replacing piping, furnishing a new 350A Shunt Trip Breaker, and demoing the existing UPS. A site visit is scheduled for 10 June 2026 at 1300 MDT, with requests due by 08 June 2026 at 1200 MDT. Questions must be submitted by 12 June 2026 at 1000 MDT. No budget amount is specified in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W7N9 USPFO ACTIVITY WYANG 153
  PSC   MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT
LOCATION:

Links ()

Attachments ()


Data sourced from SAM.gov. View Official Posting »

Upgrade UPS & Cooling System

Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S8W-26-Q0001

This opportunity requires a contractor to uninstall outdated equipment and install new Uninterruptible Power Supply (UPS) and Cooling Distribution Units at a data center in Cheyenne, Wyoming. Key tasks include replacing piping, installing a new 350A shunt trip breaker, and disposing of the old UPS. A site visit is scheduled for June 10, 2026, at 217 Dell Range Blvd, Cheyenne, WY. Questions regarding the requirement are due by June 12, 2026. No specific budget amount is provided in the description.

Department/Ind.Agency Subtier Office
DEPT OF DEFENSE DEPT OF THE ARMY W7N9 USPFO ACTIVITY WYANG 153
  PSC   6150 MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT


Data sourced from SAM.gov. View Official Posting »