Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S8U20B0001
This project is to update the HVAC and DDC systems base wide. It will also require contractors to provide temporary equipment (boilers and chillers) to maintain 70°F in affected facilities from the da...
This project is to update the HVAC and DDC systems base wide. It will also require contractors to provide temporary equipment (boilers and chillers) to maintain 70°F in affected facilities from the date of award. Options include: Replacing the hydronic system with split systemin Building 318, Replace RTU and split system and modify ductwork at Building402 and replacing the boiler in Building 301. This IFB also includes a Brand Name Justification and Requirement for the use of Automated Logic Controls (ALC) Systems. All work is IAW the provided drawings and specifications provided with the solicitation.