178th Wing Base Microgrid Construction
W50S8Q-26-B-A001
This project involves constructing a base-wide microgrid at 701 Regula Ave, Springfield, OH, to ensure energy resilience for critical 24/7 operations. The estimated budget is between $7,000,000 and $9,000,000. The work includes a base bid for natural gas generators, microgrid controls, and general work, with options for a PV solar array and a Battery Energy Storage System. All equipment interfacing with the base’s digital controls must be compatible with Honeywell Niagara 4. The project is set aside for total small businesses.