Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:W50S8K22Q0003
***Update, 22 September 2022: Amendment 1 and Responses to Pre-Quote Requests for Information have been added. New quote due date is 26 September 2022 at 10:00 AM central time. Contractor shall remove...
***Update, 22 September 2022: Amendment 1 and Responses to Pre-Quote Requests for Information have been added. New quote due date is 26 September 2022 at 10:00 AM central time. Contractor shall remove and replace current copper cables in Building 37 replacing with fiber optic cables and necessary peripheral materials and equipment using current ISP conduit/raceway system. Contractor shall install additional fiber optic cables with necessary peripheral materials and equipment in Building 280 using current ISP conduit system. In addition to the increase in fiber cables and peripherals, current keyed fiber patch panels and keyed fiber wall ports will be replaced with specified/standard fiber patch panels and fiber wall ports. The existing fiber in Building 280 will stay in place. See attahed Performance Work Statement for Details.