Battery Energy Storage System (BESS) Relocation
This is a first-time requirement with no incumbent contractor. It involves relocating a Generac Model SBE500 Battery Energy Storage System from a storage lot near Dover Air Force Base, Delaware, to Hanger 101 at Stewart Air National Guard Base, New York. The contractor must visually inspect the BESS, load and transfer it, and offload it onto provided dunnage without damaging the ground surface. The contractor is solely responsible for providing all equipment needed for loading and offloading, including cranes or forklifts. No budget information or submission timelines are specified in the description.