Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S8C-20-Q-0009
Closing date extended to Aug 14 pending an update to the SOW proj manual. The SOW V3 and Project manual V3 are the most current. In terms of rolled carpet for 1st floor and tile carpet for 2nd floor, ...
Closing date extended to Aug 14 pending an update to the SOW proj manual. The SOW V3 and Project manual V3 are the most current. In terms of rolled carpet for 1st floor and tile carpet for 2nd floor, no alternative proposals will be accepted. A photo of the auditorium chair base plate is provided in the attachments. work is to install approximately 6000 sf sheet carpet on the first floor of building 600, and install approximately 12000 sf of tiled carpeting on the second floor of building 600. Removal of existing carpet and base will include approximately 6000 SF of sheet carpet on the first floor and approx. 12000 SF of tiled carpeting on the second floor. Removal and replacement of approximately 1700 linear feet of base cover on the first floor and approximately 3000 linear feet of base cover on the second floor. Removal will include the removal and replacement of the 2nd floor auditorium bolted down chairs. Removal will include the removal and replacement of several bolted down cabinets and 1 large desk in the 2nd floor auditorium.