VGLZ 242009 Repair and Seal Floors in B825
W50S8526BA004
The contractor must provide all personnel, equipment, and materials to repair and seal floors in building 825, including caulking expansion joints and visible cracks per the project drawings. Work must comply with the Statement of Work, specifications, and drawings, with the more stringent requirements applying. All work will be coordinated with Base Operations. No specific timelines, budget amounts, or location for performance beyond "building 825" are mentioned in the description.