VGLZ 242009 Repair and Seal Floors in B825
The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control needed to repair and seal floors in Building 825, including caulking all expansion joints and visible cracks as shown in the project drawings. Work must comply with the Statement of Work, specifications, and drawings, with the more stringent requirements applying where conflicts exist, and all activities must be coordinated with Base Operations. Numerous solicitation amendments added site visit details, drawings, room photos, and updated wage determinations, but no budget amount or performance timeline is specified in the description.
Links (4)
Attachments (11)
Data sourced from SAM.gov.
View Official Posting »