VGLZ 182035 REPAIR BASE PERIMETER ROAD
This project involves constructing new 2- and 3-lane roads, including full-depth pavement repairs, mill/overlay, crack repairs, and subsurface edge drainage along the Perimeter Road and Jefferson Ave. Work must comply with a Macomb County Soil Erosion Permit, which the contractor must obtain and pay for, and all activities must be coordinated with Base Operations to maintain constant traffic flow. The performance location is the base perimeter road, covering 4.2 miles, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes for one mile. A site visit is scheduled for Wednesday, 3 June 2026, at 2:00pm EDT, with a second visit on Thursday, 11 June 2026, at 11:00am EDT. No budget amounts are specified.