Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:W50S8522R0008
The contractor shall schedule and perform a construction task for the repair of the existing HVAC system in Building 128 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will...
The contractor shall schedule and perform a construction task for the repair of the existing HVAC system in Building 128 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will provide complete repairs to create and operable HVAC system for B128. The construction will consist of demolition and replacement of HVAC system components as described in this SOW. All work will be in accordance with The Selfridge ANG Base Design Standards. The installation and replacement shall include but is not limited to all piping and line set connections, power connections and system start-up and validation. The period of performance shall be (365) days. The contractor will submit a detailed work schedule prior to construction that documents the completion in (365) working days or less. Weekend and off shift hours work may be required for this construction but is not preferred. The HVAC equipment will be demoed and the new HVAC equipment will be installed in existing or reworked locations as shown on the plans. Installation drawings and design drawings are provided as schematics for this installation work. The contractor and any subcontractors will perform site visits and site assessments prior to bidding and construction to cover all cost of the HVAC equipment replacements and installation work. The contractor is responsible for a complete assessment of all site conditions prior to bids and all cost will be included in the bid. The installation will be in new location or reworked locations. The contractor will provide all labor and material for new mechanical and electrical connections to HVAC. This work will include any required electrical of mechanical connections that are required to be installed new or replaced for full operation on new and replaced HVAC units. All work on the existing buildings brick and any new wall penetrations or modifications will be performed by an approved journeyman mason contractor with at least (5) years of experience with historical brick. All new brick penetrations will be performed in an approved method with minimal impact on the existing brick. The Selfridge Study of Historical Brick is included with the contract documents. All controls shall match existing base ALC controls systems: (Automated Logic Controls) Please see attached Statement of Work, Drawings and Brand Name Justification for further detail. There will be a site visit for this project on Tuesday, 23 August 2022 at 10:30 am (EST). If you are interested in attending, please ensure you fill out the attached vetting form (with all requested info) and submit to: 127SFS.PassandID.org@us.af.mil NLT 3 business days prior to the site visit. Updated base vetting form added 17 August 2022 8/24/2022: Added Pre-Proposal Conference Minutes and Site Visit Sign-In Sheet